PIPE1 - Pipelines Safety Regulations

progress

Note: [*]denotes mandatory field

Notifier Details
Notifier Details



Pipeline operator details
Pipeline operator details

Registered Address

Contact details (if different from notifier)
Contact Details



Specify type(s) of Notification to be included
Please select the type(s) of notification that you are including in this notification. On clicking Next> you will be taken to the appropriate section(s) of the form, where you can provide the required information. Each section can be filled in multiple times if required.
Please indicate the types of notification to be included. At least one must be selected.
Before construction notification (Reg 20, Schedule 4)   
About notifying before construction activities

Regulation 20 requires that the construction of a new major accident hazard (MAH) pipeline should not start until the operator has notified HSE at least six months prior to the start of construction.

Details required are listed at Schedule 4 of the PSR.

Multiple Construction Sites: Under Regulation 20 if construction of a MAH pipeline occurs at more than one location (i.e. onshore, offshore or a combination of both) and in more than one stage, notification to HSE should occur at least 6 months before the first stage begins. Construction of the pipeline under these circumstances is deemed to start at the first stage on land and not at the subsequent stage offshore.
Please provide the required details for the construction notification and click "Add" to record the notification. Repeat for any additional construction notifications. Once all construction notifications have been entered click "Next >" to move on to the next section.
Before construction notification details.

Up to 1500 characters allowed 0 / 1500 characters

Up to 1500 characters allowed 0 / 1500 characters

Up to 1500 characters allowed 0 / 1500 characters
Start and end points for the pipeline and pipeline measurements   
Start and End Points Field Help

Onshore: Provide the Grid reference for the start and finish points of the pipeline.

Offshore: Provide the longitude/latitude for the start and finish points of the pipeline.









Up to 1500 characters allowed 0 / 1500 characters

   

Fluid Conveyed Field Help

Please send any fluid composition data sheets (and provide details on the Supporting Information page) where detailed analysis of fluid composition is available, typically for offshore well fluids.

Up to 1500 characters allowed 0 / 1500 characters
Safe operating limits of the pipeline




Up to 1500 characters allowed 0 / 1500 characters
Intended temperature, pressure, maximum rate of flow

Up to 1500 characters allowed 0 / 1500 characters
Estimated timescales   
Estimated Timescales Field Help

Please provide best estimates of dates when pre-fabrication or construction site works are scheduled to commence and the date when dangerous fluids will be first introduced into the pipeline.

It is understood that these dates may change but that operators will update HSE on this via the established contact route, as required.

   

Details of Planning Authority Areas Field Help

These details are required for onshore pipelines only to enable LUP planning advice to be given to all the Local Planning Authority areas where the pipeline will pass through. Simply provide the names of all the relevant Planning Authorities; e.g. Aberdeenshire, Angus etc.
Up to 1500 characters allowed 0 / 1500 characters
Details of construction notifications
Location locationOnshore locationOffshore pipelineRoute pipelineRiser pipelineUse Pipeline Start Pipeline End pipelineLength pipelineDiameter pipelineWall pipelineCover pipelineDesignCode Val pipelineDesignCode Text pipelineMaterial Val pipelineMaterial Text pipelineOtherDesign pipelineFluidConveyed Val pipelineFluidConveyed Text pipelineOtherFluid pipelinePressure pipelinePressureUnit Val pipelinePressureUnit Text pipelineTemperatureMin pipelineTemperatureMax pipelineTemperatureUnit Val pipelineTemperatureUnit Text pipelineOtherLimits pipelineOperConditions pipelineConstructionDate pipelineOperationDate pipelineAuthority  
Before use/re-use notification (Reg 21)   
Under regulation 21, HSE requires 14 days prior notification of the intention to bring a major accident hazard (MAH) pipeline into use.

This regulation also applies where a pipeline is to be brought back into use after it has been taken out of commission (other than where the circumstances were routine maintenance, planned or emergency repair).
Please provide the required details for the use/re-use notification and click "Add" to record the notification. Repeat for any additional use/re-use notifications. Once all use/re-use notifications have been entered click "Next >" to move on to the next section.
Before use/re-use notification details.

   

Description of Pipeline Field Help

Please use the same description used in any previous notification and/or communication; e.g. from any previous r20 notification before construction.
Up to 1500 characters allowed 0 / 1500 characters

   

Other Information Field Help

Please provide any other relevant information that helps to identify the background to the notification; e.g. first use, or bringing back into use following repair to 3rd party damage.
Up to 1500 characters allowed 0 / 1500 characters
   
HSE Reference Number Field Help

To help track and align notifications to earlier notifications (e.g. r20) or correspondence please provide details of any HSE references provided; e.g. the original on line reference number from any earlier notification and/or any reference provided by HSE on correspondence.
Details of use/resue notifications
Date Description Other info HSE reference  
Change of operator notification (Reg 22(1))   
The operator of a MAH pipeline may change at any time throughout the life of a pipeline.

Under regulation 21, any change of operator must be notified to the HSE within 14 days of the change.

If a pipeline is transferred from one operator to another, there must be sufficient information passed to the new operator so that the relevant duties can be complied with.
Please provide the required details for the change notification and click "Add" to record the notification. Repeat for any additional change notifications. Once all change notifications have been entered click "Next >" to move on to the next section.
Change of Operator notification details.
New Operator details
New Operator details

Registered Address

Old Operator details
Old Operator details

Registered Address

Contact details (if not provided elsewhere)
Contact Details



   

Details of Pipelines the New Operator will be Responsible For Field Help

Please provide brief details of all pipelines that are being transferred as part of this change of operatorship notification; e.g. name or start & finish points of pipeline(s) along with details of diameter and material and any unique identifier(s).
Up to 1500 characters allowed 0 / 1500 characters
Details of operator change notifications
New operator? New operator Yes New operator No Date Organisation Name Address Line 1 Address Line 2 Address Line 3 Town County Postcode Organisation Name Old Address Line 1 Old Address Line 2 Old Address Line 3 Old Town Old County Old Postcode Old Contact Title Contact Forename Contact Family Name Contact Line 1 Contact Line 2 Contact Line 3 Contact Town Contact County Contact Postcode Contact Telephone Contact Email Details  
Other changes notification (Reg 22(2), 22(3), Schedule 5)   
Please note the notification period for this Regulation is at least 3 months.

This Regulation concerns significant changes to the pipeline which can affect the level of risk, please see HSE pipelines notifications web pages
Please provide the required details for the other change notification and click "Add" to record the notification. Repeat for any additional other change notifications. Once all other change notifications have been entered click "Next >" to move on to the next section.
Other change notification details.

Up to 1500 characters allowed 0 / 1500 characters

   

Details of Pipelines to Which the Change Refers Field Help

Please provide brief details of the pipelines involved in the notified modification/change; e.g. name or start & finish points of pipeline(s) along with details of diameter and material and any unique identifier(s).
Up to 1500 characters allowed 0 / 1500 characters
Details of other notifications
Regulation Regulation 22(2) Regulation 22(3) Type Change to route Major Modification Change to SOL Change to fluid Decommissioning Date Description of Change Details of Pipelines  
Supporting Information
Please note, we are unable to accept attachments to this notification. All supporting documentation must be sent by email to pipelines.aberdeen@hse.gov.uk or pipelines.norwich@hse.gov.uk.

Up to 1500 characters allowed 0 / 1500 characters
*Details of changes

Thank you for submitting your Pipeline Safety Regulations notification

Your form has been received and has been assigned the Notification number . If you wish to keep a copy of the form, please download it using the button below. YOU WILL NOT RECEIVE ANY OTHER CONFIRMATION.
Please remember to email your supporting documentation to quoting your organisation name and the above Notification Number.

Return to HSE website.